Wentworth Dr, Kelso

Description

Civil Construction Sub-Division Wentworth Drive Kelso – Stage 1,2 and 3

Specifications

Soil Erosion & Sediment Control, Bulk Earthworks, Strip & Stockpile topsoil from Roads, Footpaths to nominal 150mm Depth, Trim & Compact Sub grade, Drainage, Sewerage, Storm Water, Gravel Pavement, Kerb & Gutter, Bitumen Pavement Seal, Water Supply, Water Services to individual Lots, Road crossings for Electricity, Gas & Telstra, Create Swale Drain, Provide erosion protection in drain, Create Sediment Basin